Construction of the Maureen Murphy Wilkens Science Center
.jpg)
June 4, 2009
A view of the Maureen Murphy Wilkens Science Center from the exit of the Administration Building.
.jpg)
July 22, 2009
The new quad area begins to take shape with the placement of new walkways!

June 4, 2009
Throughout the summer, work will continue on the Maureen Murphy Wilkens Science Center’s interior in preparation for occupancy this fall.

June 4, 2009
Work on the Center’s partition, which connects to the Administration Building, was performed during the spring months. This area will include interactive space for students to study and continue discussions outside of class.

April 15, 2009
...the use of brick, cast stone and the arrangement of windows on the entry side echoes the design of the Administration Building.
